Module Details
Module Code: |
BULD8004 |
Title: |
Construction Project Controls
|
Long Title:
|
Construction Project Controls
|
NFQ Level: |
Advanced |
Valid From: |
Semester 1 - 2022/23 ( September 2022 ) |
Field of Study: |
5821 - Building Science
|
Module Description: |
This module provides the student with an understanding of modern construction production methods and of the systems and procedures that are used to control construction projects.
|
Learning Outcomes |
On successful completion of this module the learner will be able to: |
# |
Learning Outcome Description |
LO1 |
Evaluate alternative construction project control systems for use in varying situations. |
LO2 |
Plan and control construction projects using advanced project management software. |
LO3 |
Evaluate different construction production methods and systems. |
LO4 |
Evaluate the effectiveness of different construction production methods in alternative situations. |
LO5 |
Appraise design team appointment and management of design teams. |
Dependencies |
Module Recommendations
This is prior learning (or a practical skill) that is strongly recommended before enrolment in this module. You may enrol in this module if you have not acquired the recommended learning but you will have considerable difficulty in passing (i.e. achieving the learning outcomes of) the module. While the prior learning is expressed as named MTU module(s) it also allows for learning (in another module or modules) which is equivalent to the learning specified in the named module(s).
|
|
Incompatible Modules
These are modules which have learning outcomes that are too similar to the learning outcomes of this module. You may not earn additional credit for the same learning and therefore you may not enrol in this module if you have successfully completed any modules in the incompatible list.
|
No incompatible modules listed |
Co-requisite Modules
|
No Co-requisite modules listed |
Requirements
This is prior learning (or a practical skill) that is mandatory before enrolment in this module is allowed. You may not enrol on this module if you have not acquired the learning specified in this section.
|
No requirements listed |
Indicative Content |
Productivity Controls
Evaluation of alternative construction programming systems. The role of the construction planner within the construction process. Measuring construction productivity and work study. Use of Lean Construction techniques.
|
Project Information Systems (Productivity)
Project progress monitoring systems, progress feedback mechanisms, progress recording, reporting and presentation including Lean Construction initiatives.
|
Project Information Systems (Financial)
Cost value reconciliation systems, design variation control procedures, project financial reports and their presentation, change control, variation control.
|
Project Information Systems (Design)
Design team relationships, design team communication systems, evolution of design information, recording, disseminating, controlling and presenting design change. Request for information and submissions. The Building Control Amendment Regulations (BCAR).
|
Advanced Computerised Project Controls
Use of Primavera P6 project management software, advanced applications of Microsoft Project software, Navisworks and syncro-BIM software.
|
Module Content & Assessment
|
Assessment Breakdown | % |
Coursework | 20.00% |
End of Module Formal Examination | 80.00% |
Assessments
End of Module Formal Examination |
|
The University reserves the right to alter the nature and timings of assessment
Module Workload
Workload: Full Time |
Workload Type |
Contact Type |
Workload Description |
Frequency |
Average Weekly Learner Workload |
Hours |
Lecture |
Contact |
Theory on course topics and worked examples. |
Every Week |
2.00 |
2 |
Lab |
Contact |
Assessment of practical competency in the utilisation of industry-standard software |
Every Week |
2.00 |
2 |
Independent & Directed Learning (Non-contact) |
Non Contact |
Review of lecture notes and recommended material and preparation of worked examples for selected laboratory sessions |
Every Week |
3.00 |
3 |
Total Hours |
7.00 |
Total Weekly Learner Workload |
7.00 |
Total Weekly Contact Hours |
4.00 |
Workload: Part Time |
Workload Type |
Contact Type |
Workload Description |
Frequency |
Average Weekly Learner Workload |
Hours |
Lecture |
Contact |
Theory on course topics and worked examples. |
Every Week |
1.00 |
1 |
Lab |
Contact |
Assessment of practical competency in the utilisation of industry-standard software |
Every Week |
1.00 |
1 |
Independent & Directed Learning (Non-contact) |
Non Contact |
Review of lecture notes and recommended material and preparation of worked examples for selected laboratory sessions |
Every Week |
5.00 |
5 |
Total Hours |
7.00 |
Total Weekly Learner Workload |
7.00 |
Total Weekly Contact Hours |
2.00 |
Module Resources
|
Recommended Book Resources |
---|
-
Chartered Institute of Building. (2014), Codeof practice for project management for construction & development, 5th. Wiley-Blackwell, [ISBN: 978-1-4051-9420].
-
Gary Santorella. (2016), Lean Culture for the Construction Industry, ebook. Productivity Press - M.U.A., [ISBN: 9781439835104].
| Supplementary Book Resources |
---|
-
Carl Chatfield, Timothy Johnson D.,. (2010), Microsoft Project 2010 Step by Step, [ISBN: 9780735626959].
-
Brian Cooke and Peter Williams. (2009), Construction Planning Programming and control, 3rd. Wiley - Blackwell, [ISBN: 9781405183802].
-
Grey, C & Hughes, W. (2001), Building Design Management, Butterworth-Heinmann, Oxford, [ISBN: 0750650702].
| Recommended Article/Paper Resources |
---|
-
Low Sui Pheng, Shang Gao, Jun Liang Lin. (2015), Converging early contractor involvement
(ECI) and lean construction practices
for productivity enhancement: Some
preliminary findings from
Singapore", International Journal of Productivity
and Performance Management, Vol. 64,
| Other Resources |
---|
-
Website, Lean Construction Ireland. (2021), Lean Construction Ireland, Dublin,
-
Website, Autodesk. (2021), Autodesk BIM 360 - Connect your
workflows, teams and data., Autodesk,
-
Website, Department of Housing, Planning and
Local Government. (2019), Building Regulations,
-
website, Synchro software,
-
website, Microsoft Project software,
|
|