Module Details
Module Code: |
CRAF6012 |
Title: |
Carpentry - Semi-circular Roofing
|
Long Title:
|
Carpentry - Semi-circular and Turret Roofs
|
NFQ Level: |
Fundamental |
Valid From: |
Semester 1 - 2015/16 ( September 2015 ) |
Field of Study: |
2150 - Craft
|
Module Description: |
This module develops a students knowledge of roofing and describes the detailed geometry involved in the design, development and construction of Semi-circular and Polygonal based Turret Roofs.
|
Learning Outcomes |
On successful completion of this module the learner will be able to: |
# |
Learning Outcome Description |
LO1 |
Set out and cut a polygonal based turret roof. |
LO2 |
Apply the geometric details of seat cuts in turret roof rafters. |
LO3 |
Construct using best practice, the arrangement and fixing of rafters at the apex. |
LO4 |
Set out and cut a roof with a semi-circular hipped end and off-square/polygonal plan. |
LO5 |
Cut and fit tiling battens to a semi-circular roof. |
LO6 |
Shape and fix wall plates for the semi-circular roof. |
Dependencies |
Module Recommendations
This is prior learning (or a practical skill) that is strongly recommended before enrolment in this module. You may enrol in this module if you have not acquired the recommended learning but you will have considerable difficulty in passing (i.e. achieving the learning outcomes of) the module. While the prior learning is expressed as named MTU module(s) it also allows for learning (in another module or modules) which is equivalent to the learning specified in the named module(s).
|
|
Incompatible Modules
These are modules which have learning outcomes that are too similar to the learning outcomes of this module. You may not earn additional credit for the same learning and therefore you may not enrol in this module if you have successfully completed any modules in the incompatible list.
|
No incompatible modules listed |
Co-requisite Modules
|
No Co-requisite modules listed |
Requirements
This is prior learning (or a practical skill) that is mandatory before enrolment in this module is allowed. You may not enrol on this module if you have not acquired the learning specified in this section.
|
No requirements listed |
Indicative Content |
Workshop Practice
Safe practice in the design and production of a semi-circular roof and a turret roof involving machines that requires the completion of an inspection checklist.
|
Construction
Cut and construct a semi-circular and a turret roof including hip rafters, trimmed rafters, saddle and tiling battens. Using Bandsaw and CNC where applicable.
|
Materials
Natural softwood PAO, manufactured boards.
|
Design
Scale drawing developed using geometric principles to include hip rafters, jack rafters wall plates.
|
Skills
Determination of bevels and lengths, cutting to bevels and lengths, fixing, nailing roof components.
|
Module Content & Assessment
|
Assessment Breakdown | % |
Coursework | 100.00% |
Assessments
No End of Module Formal Examination |
Reassessment Requirement |
Coursework Only
This module is reassessed solely on the basis of re-submitted coursework. There is no repeat written examination.
|
The University reserves the right to alter the nature and timings of assessment
Module Workload
Workload: Full Time |
Workload Type |
Contact Type |
Workload Description |
Frequency |
Average Weekly Learner Workload |
Hours |
Lab |
Contact |
Practical Skills |
Every Week |
6.00 |
6 |
Independent & Directed Learning (Non-contact) |
Non Contact |
Revision/review of module content |
Every Week |
1.00 |
1 |
Total Hours |
7.00 |
Total Weekly Learner Workload |
7.00 |
Total Weekly Contact Hours |
6.00 |
This module has no Part Time workload. |
Module Resources
|
Recommended Book Resources |
---|
-
Brian Porter, Chris Tooke. (2012), Carpentry and Joinery 2, 3rd. Routledge, London, p.225, [ISBN: 9781136422645].
-
by George Collings with annotations and illustrations by Karl Shumaker ; edited by Roger Holmes.. (1992), Circular work in carpentry and joinery, 5th. Stobart Davies, p.126, [ISBN: 9780854420544].
| Supplementary Book Resources |
---|
-
Duncan Marshall, Derek Worthing, Nigel Dann, Roger Heath. (2013), The Construction of Houses, 5th. Taylor & Francis, London, p.456, [ISBN: 9781136152948].
| Recommended Article/Paper Resources |
---|
-
Health and Safety Authority. Inspection Checklist,
-
Health and Safety Authority. Power Tool Inspection Template,
| Other Resources |
---|
-
Website, Architecture Week. (2011), Great Buildings, Architecture Week,
-
Website, Fine Homebuilding. Exploring Octagonal Roofs, Fine Homebuilding,
-
Website, Fine Homebuilding. Building Circular Roofs, Fine Homebuilding,
-
Website, Roof Framing 101. Rafter Calculator, Roof Framing 101,
-
Website, Fine Homebuilding. An Octaonal Turret Roof, Fine Homebuilding,
-
Video Website, Fernairi Construction. (2013), Making a Circular Roof, Fernairi Construction,
-
Picture Website, Houzz. (2015), Circular Roofs, Houzz,
-
Website, Joseph Jenkins. (2009), Conical Roofing Simplified,
|
|