Module Details
Module Code: |
MANU6010 |
Title: |
Building Services Project
|
Long Title:
|
Building Services Project
|
NFQ Level: |
Fundamental |
Valid From: |
Semester 1 - 2016/17 ( September 2016 ) |
Field of Study: |
5400 - Manufacturing Engineering
|
Module Description: |
This module has been designed to allow the planning, design, drawing and budgeting for the mechanical building services for a small factory unit. Services include hot and cold water, low pressure hot water heating, ventilation system.
|
Learning Outcomes |
On successful completion of this module the learner will be able to: |
# |
Learning Outcome Description |
LO1 |
Plan for the execution of a design project for mechanical building services in a small industrial building. |
LO2 |
Design mechanical building services under guidance using standard techniques. |
LO3 |
Represent mechanical building services graphically using industry standard IT tools |
LO4 |
Produce a budget for the installation of mechanical building services. |
LO5 |
Produce a project brief to communicate engineering requirements to other technically qualified personnel |
Dependencies |
Module Recommendations
This is prior learning (or a practical skill) that is strongly recommended before enrolment in this module. You may enrol in this module if you have not acquired the recommended learning but you will have considerable difficulty in passing (i.e. achieving the learning outcomes of) the module. While the prior learning is expressed as named MTU module(s) it also allows for learning (in another module or modules) which is equivalent to the learning specified in the named module(s).
|
|
Incompatible Modules
These are modules which have learning outcomes that are too similar to the learning outcomes of this module. You may not earn additional credit for the same learning and therefore you may not enrol in this module if you have successfully completed any modules in the incompatible list.
|
No incompatible modules listed |
Co-requisite Modules
|
No Co-requisite modules listed |
Requirements
This is prior learning (or a practical skill) that is mandatory before enrolment in this module is allowed. You may not enrol on this module if you have not acquired the learning specified in this section.
|
No requirements listed |
Indicative Content |
Planning.
Project schedule, safety plan.
|
Hot and Cold water
Storage Tanks, calorifiers, vent pipes, labelling.
|
Low pressure hot water.
Fill and expansion tanks, vent pipes, boilers, circulating pump, radiators, radiant heaters.
|
Ventilation.
Reasons for ventilation, ventilation grilles.
|
Budgeting.
Material take off list, unit rates, budget costs, supplier information.
|
Module Content & Assessment
|
Assessment Breakdown | % |
Coursework | 100.00% |
Assessments
No End of Module Formal Examination |
Reassessment Requirement |
Coursework Only
This module is reassessed solely on the basis of re-submitted coursework. There is no repeat written examination.
|
The University reserves the right to alter the nature and timings of assessment
Module Workload
Workload: Full Time |
Workload Type |
Contact Type |
Workload Description |
Frequency |
Average Weekly Learner Workload |
Hours |
Lab |
Contact |
Drawing using CAD package |
Every Week |
2.00 |
2 |
Lecture |
Contact |
Class based instruction |
Every Week |
1.00 |
1 |
Independent & Directed Learning (Non-contact) |
Non Contact |
Planning, Design and Budgeting of services |
Every Week |
4.00 |
4 |
Total Hours |
7.00 |
Total Weekly Learner Workload |
7.00 |
Total Weekly Contact Hours |
3.00 |
Workload: Part Time |
Workload Type |
Contact Type |
Workload Description |
Frequency |
Average Weekly Learner Workload |
Hours |
Lecture |
Contact |
Class based instruction |
Every Week |
1.00 |
1 |
Lab |
Contact |
Drawing using CAD package |
Every Week |
2.00 |
2 |
Independent & Directed Learning (Non-contact) |
Non Contact |
Self-directed learning |
Every Week |
4.00 |
4 |
Total Hours |
7.00 |
Total Weekly Learner Workload |
7.00 |
Total Weekly Contact Hours |
3.00 |
Module Resources
|
Recommended Book Resources |
---|
-
CIBSE Guide A. (2006), Environmental Design, [ISBN: 978-1-903287-66-8].
-
CIBSE Guide B. (2005), Heating, Ventilating, Air Conditioning and Refrigeration, [ISBN: 978-1-903287-58-3].
-
CIBSE Guide C. (2007), Reference Data, [ISBN: 978-1-903287-80-4].
-
BSRIA. (2011), Rules of Thumb, 5th. [ISBN: 978-0-86022 692 5].
-
BSRIA. (2009), The Illustrated Guide to Ventilation, [ISBN: 978-0-86022-673-4].
-
Fred Hall, Roger Greeno. (2013), Building Services Handbook, 7th. Routledge, [ISBN: 978-0-415-63140-2].
| This module does not have any article/paper resources |
---|
This module does not have any other resources |
---|
|